Proceeding contribution from Lord Berkeley (Labour) in the House of Lords on Monday, 17 October 2011. It occurred during Debate on bill on Localism Bill.


Localism Bill

My Lords, I assure the House that I shall be quicker than the last group of amendments. This is something that has come up quite recently, when we have tried to see how the IPC and the Planning Act 2008 should be applied to railway projects. It appears that there is no minimum size for railway projects to have to go to the IPC under the Planning Act. The example that has been brought to my attention is the electrification of the Great Western main line between Airport Junction, which is near Heathrow, and Cardiff, where Network Rail may have to demolish certain bridges or do other works. It mainly has the permitted development rights for those works but some of them may creep a few yards outside those rights. It has been suggested that any such creep would need permission through the IPC, so the amendment suggests that it would be nice if the Secretary of State were minded to direct that specific and maybe small developments outside the limits of permitted developments could proceed without any other process, on the basis that they were quite small. It is not just about the electrification of the Great Western main line. The East West Rail project, roughly between Oxford and Milton Keynes, has found two places where the existing railway has never had permission. One little connection between two lines was built in the last war and nobody can find the documentation giving it permission; it may be with the British Rail Property Board but it has not found it. There is another place where the route that got permission went through a farm and the actual railway went round it; clearly the person owning the farm at the time saw somebody all right and there was a gentle deviation, which of course was no problem 150 years ago. Quite rightly, the promoters of this line want to get the legal situation correct before they start building. There is a problem here which requires some change to the Planning Act, probably to Section 14. Perhaps the Secretary of State might be minded to bring forward regulations to find a way of getting some smaller railway projects permissions in a process outside of the IPC, which is meant for big projects and takes a long time to do. One can debate whether the problems here are with the Transport and Works Act, an ordinary planning application or something else, but I am sure the Minister will understand them. Maybe he has a better solution. I am grateful to him for the meeting that he arranged some time this summer. I cannot remember when it was now but we had a good discussion about this. What we do not want is for our new Secretary of State for Transport to turn round in six months’ time and say that the electrification is held up for a couple of years because they cannot get permission for a couple of yards’ extension to a bridge and that it has to go to the IPC. On that basis, I beg to move.


Secondary information

Type
Proceeding contribution
Reference
731 c111-2 
Session
2010-12
Chamber / Committee
House of Lords chamber
Subjects
Compensation Appeals Compulsory purchase Advertising Construction Equality Housing Finance Land Infrastructure Green belt Local government Planning permission Nuisance Planning Natural gas Public consultation Public expenditure Referendums Railways Property development Parish and town councils Local plans Sustainable development Travellers Regional spatial strategies Affordable housing Infrastructure Planning Commission Community infrastructure levy Village greens
Link
View this Proceeding contribution on www.publications.parliament.uk